PROJECT HIGHLIGHTS
![]() |
SECTOR | Healtcare |
![]() |
COUNTRY | Chile |
![]() |
CONSTRUCTION | 2015-2019 |
PROJECT DESCRIPTION
NBI was EPC contractor for the sanitary, mechanical and electrical water systems of the new hospital in Santiago de Chile. The facility is located in an area with a high risk of earthquakes. The anti-seismic, redundancy and continuity of the systems together with energy efficiency are the targets of the NBI intervention.
The “Félix Bulnes” has 10 levels in elevation, three underground levels for a built volume of 620,000 cubic meters, 523 beds, 16 surgical rooms, 98 examination rooms and 36 clinical clinics.